Installation Procedure
NOTE:
Refer to FASTENER NOTICE
.
IMPORTANT:
DO NOT apply thread sealant to sensor threads. The sensor is coated at factory and applying additional sealant will affect the sensors ability to detect detonation.
- Install the knock sensor (4).
Tighten: Tighten the knock sensor to 19 N.m (14 lb ft).
- Install the knock sensor heat shield.
Tighten: Tighten the bolts to 60 N.m (44 lb ft).
- Connect the knock sensor electrical connector.
- Install the transaxle. Refer to Transmission Replacement for the 4T65-E transmission.
- Fill the cooling system. Refer to Cooling System Draining and Filling (L26 GE 47716 Fill) or Cooling System Draining and Filling (L26 Static Fill) .