FixVault

Installation Procedure

    Fig 1: View Of A/T Shift Lock Control & Pivot Points
    GM442716Courtesy of GENERAL MOTORS CORP.
  1. Install the automatic shift lock actuator to the base of the shift lock control and the pivot point (1).
  2. Fig 2: Identifying Electrical Connector From Shift Lock Control
    GM190956Courtesy of GENERAL MOTORS CORP.
  3. Connect the automatic shift lock actuator electrical connector.
  4. Install the center console. Refer to Front Floor Console Replacement .
  5. Connect the negative battery cable. Refer to Battery Negative Cable Disconnection and Connection (L26) or Battery Negative Cable Disconnection and Connection (LS4) .