Installation Procedure
- Install the ETC with the seal ring.
- Install the ETC tightening bolts (2).
Tighten: Tighten the ETC tightening bolts to 8 N.m (70.8 lb in).
- Connect the coolant inlet hose (3).
- Connect the coolant outlet hose (1).
- Connect the EVAP hose (5).
- Connect the PCV hose (4).
- Connect the ETC connector.
- Install the air-cleaner assembly. Refer to Air Cleaner Assembly Replacement
- Refill the engine coolant. Refer to Cooling System Draining and Filling
- Disconnect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .
CAUTION:
Refer to Fastener Caution
.