FixVault

Component Testing

WARNING: This page is about a different variant/trim than selected.
  1. Install a 10A fused jumper wire between the control circuit terminal A and 12 volts. Install a jumper wire between the transmission shift select switch (park) signal circuit terminal B and ground.
  2. Listen for the solenoid to turn ON and OFF.
    • If the function does not perform as specified, replace the shift lock actuator.