FixVault

Ignition Coil Resistance Check

  1. Turn ignition switch off. Remove coil wires. Using an ohmmeter set at the low scale, attach leads to ignition coil primary terminals 1 and 15 (wires removed). See Fig 1. Take primary resistance reading.
    Fig 1: Hookup for Primary & Secondary Coil Resistance Checks Diagram also shows ohmmeter hookup for ballast resistor check.
    G28924
  2. Set ohmmeter to x1000 scale. Connect ohmmeter leads to negative terminal 1 and coil tower terminal 4 (high tension). Take secondary resistance reading.
  3. If either the primary or the secondary reading was not within specifications, replace coil.
IGNITION COIL RESISTANCE SPECIFICATION

Application Primary Secondary
Porsche .33-.46 7000-12,000