FixVault

Engine Hesitation

  1. Perform GROUND POINTS & CONNECTOR/TERMINAL TEST  and EZF IGNITION CONTROL UNIT POWER SUPPLY TEST  .
  2. Perform SPEED/REFERENCE MARK SENSOR TEST , LOAD SENSOR TEST , THROTTLE SWITCH - IDLE CONTACT TEST , and EZF IGNITION SYSTEM OUTPUT TESTS  .