FixVault

Subsequent Work

  1. Install rear roof trim panel. → Installing roof lining
  2. Install D-pillar trim. → Installing D-pillar trim
  3. Install C-pillar trim. → Installing C-pillar trim panel and release for belt height adjustment
  4. Install B-pillar trim. → Installing B-pillar trim panel
  5. Install A-pillar trim. → Installing A-pillar trim
  6. Carry out work instruction after disconnecting the battery. → WM 9000IN WORK INSTRUCTIONS AFTER DISCONNECTING THE BATTERY (ALL MODELS)