FixVault

Installation Procedure

  1. Install the battery positive cable to the generator and secure the positive cable with the nut (1).

    Tighten:  Tighten the generator positive cable nut to 9 N.m (80 lb in).

    Fig 1: View Of Rear Generator (Alternator)
    GM754357Courtesy of GENERAL MOTORS CORP.
    NOTE: Refer to Fastener Notice .
  2. Install the generator and secure the generator with 3 bolts.

    Tighten:  Tighten the generator bolts to 50 N.m (37 lb ft).

  3. Install the engine lift hook and secure the lift hook with 2 bolts.

    Tighten:  Tighten the bolts to 50 N.m (37 lb ft).

    Fig 2: View Of Engine Lift Bracket
    GM750247Courtesy of GENERAL MOTORS CORP.
  4. Install the A/C line bracket to the lift hook and secure the bracket with the bolt.

    Tighten:  Tighten the A/C line bracket bolt to 10 N.m (89 lb in).

    Fig 3: View Of Engine Lift Hook & A/C Bracket Bolt
    GM754344Courtesy of GENERAL MOTORS CORP.
  5. Install the drive belt. Refer to Drive Belt Replacement .
  6. Connect the battery negative cable. Refer to Battery Negative Cable Disconnection and Connection .