FixVault

To fit

  1. Fit the control module.
    Fig 1: Illustration For Steps 1-2
    G05571142Courtesy of SAAB-SCANIA OF AMERICA, INC.
    IMPORTANT: Take care when plugging in the connector so as not to damage or press out the pins/sleeves in the connector. For further information regarding connectors, refer to CONNECTORS, HANDLING AND INSPECTION .
  2. Plug in the connectors.
  3. Fit the battery cooling pipe.
  4. Fit the battery cover.
  5. Perform Procedures after fitting the control module and service programming, if necessary. See Procedure after changing the control module .
  6. If a new control module has been fitted, it must be adapted, see ADAPTATION, RESETTING .