FixVault

Installation Procedure

  1. Position the ground cable as noted during removal.
  2. NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the ground cable to side rail bolt (2).

    Tighten:  Tighten the bolt to 20 N.m (15 lb ft).

  4. Install the ground cable to the rear of the engine (1).

    Tighten:  Tighten the ground to engine block nut to 17 N.m (13 lb ft).

  5. Tape the ground cable to the wiring harness near the transmission.
  6. Fig 1: View Of Ground Cable
    GM868003Courtesy of GENERAL MOTORS CORP.
  7. Connect the negative battery cable. Refer to Battery Negative Cable Disconnect/Connect Procedure .