FixVault

Installation Procedure

    Fig 1: Removing/Installing Stationary Window
    GM1480104Courtesy of GENERAL MOTORS CORP.
  1. Install the stationary window (2) into the opening. Refer to Urethane Adhesive Installation of Bodyside Stationary Windows .
  2. Install the sliding door garnish molding. Refer to Garnish Molding Replacement - Sliding Door in Doors.
  3. Remove the double layer of masking tape around the perimeter of the painted surfaces (1).
  4. Vent the front door windows until the sliding door window urethane has cured.
  5. Install either the 40A, RH or LH power sliding door fuse to the I/P fuse block in order to enable the power to the power sliding door motor.
  6. Perform the re-initialization procedure. Refer to Actuator Control Module - Power Sliding Door (PSD) Programming and Setup .
  7. Close the sliding door.