FixVault

Installation Procedure

WARNING: This page is about a different variant/trim than selected.
Fig 1: View Of Shift Solenoid Assembly
GM886304Courtesy of GENERAL MOTORS CORP.
  1. Install the shift solenoid assembly from the shift control assembly.
  2. Connect the shift solenoid assembly wiring retainers to the shift control assembly.
    NOTE: Refer to Fastener Notice in Cautions and Notices.
  3. Install the shift solenoid retaining screw.

    Tighten:  Tighten the screw to 3 N.m (27 lb in).

  4. Install the shift indicator bulb from the shift control assembly.
  5. Install the shift control assembly. Refer to Floor Shift Control Replacement in Automatic Transaxle - 4T40-E/4T45-E.