FixVault

Installation Procedure

    Fig 1: Locating Automatic Level Control Sensor Link Ball Stud
    GM380438Courtesy of GENERAL MOTORS CORP.
  1. Install the ball stud to the rear axle tie rod.

    Tighten:  Tighten the height sensor ball stud to 12 N.m (106 lb in).

  2. Install the automatic level control sensor link to the tie rod ball stud.
  3. Lower the vehicle.
  4. Install the ELC/TRAILER fuse.