FixVault

Installation Procedure

    CAUTION: Refer to Fastener Caution .
  1. Install the battery carrier.

    Tighten:  Tighten the 3 bolts to 15 N.m (11 lb ft).

  2. Install the 2 cable ties.
  3. Insert the battery.
  4. Install the battery shield.

    Install the 2 shield, battery carrier.

    Tighten:  Tighten the bolt to 10 N.m (89 lb in).

  5. Install the battery holder.

    Tighten:  Tighten the bolt to 7 N.m (62 lb in).

  6. Connect the battery.
    • Connect the positive cable.
    • Connect the ground cable.
  7. For programming procedures, refer to Control Module References .