FixVault

Installation Procedure

    Fig 1: View Of Shift Lock Control Solenoid
    GM1285269Courtesy of GENERAL MOTORS CORP.
  1. Route the shift lock control solenoid through the opening in the front of the control assembly.
  2. Fig 2: View Of Solenoid & Ball-Sockets
    GM1285268Courtesy of GENERAL MOTORS CORP.
  3. Attach the ball-sockets to the control assembly body and the shift-lock control lever.
  4. Fig 3: View Of Shift Lock Control Solenoid Connector & Solenoid
    GM1285267Courtesy of GENERAL MOTORS CORP.
  5. Connect the electrical connector to the Shift Lock Control Solenoid.
  6. Install the automatic transaxle control assembly. Refer to Transmission Control Replacement .