FixVault

Circuit/System Verification

  1. Engine running measure and record the voltage at the battery terminals. Verify that the battery voltage is 12.6-15.5 volts.
  2. Observe the scan tool ECM Ignition 1 Signal parameter. The reading should be between 12.6 and 15.5 volts.