FixVault

Installation Procedure

    Fig 1: View Of Right Knock Sensor & Bolt
    GM860801Courtesy of GENERAL MOTORS CORP.
    CAUTION: Refer to Fastener Caution .
  1. Position the knock sensor and tighten the knock sensor bolt.

    Tighten:  Tighten the bolt to 23 N.m (17 lb ft).

  2. Fig 2: Identifying Engine Wiring Harness Electrical Connector
    GM1836545Courtesy of GENERAL MOTORS CORP.
  3. Connect the engine wiring harness electrical connector (1) to the bank 1 knock sensor.
  4. Install the exhaust manifold heat shield.
  5. Install the right catalytic converter. Refer to Catalytic Converter Replacement - Right Side (LY7) .