PCV Valve: Installation
- INSTALL VENTILATION VALVE SUB-ASSEMBLY
- Apply adhesive to 2 or 3 threads of the ventilation valve.
Adhesive:
Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent
- Install the ventilation valve.
Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf)
- Connect the ventilation hose.
- Apply adhesive to 2 or 3 threads of the ventilation valve.
- INSTALL INTAKE MANIFOLD (See INSTALLATION )
- INSTALL ENGINE OIL LEVEL DIPSTICK
- INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle) (See INSTALLATION )
- INSTALL OIL COOLER TUBE (for Automatic Transaxle) (See INSTALLATION )
- INSTALL STARTER ASSEMBLY (See INSTALLATION )
- INSTALL INJECTOR VIBRATION INSULATOR (See INSTALLATION )
- INSTALL NO. 1 DELIVERY PIPE SPACER (See INSTALLATION )
- INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY (See INSTALLATION )
- CONNECT FUEL TUBE SUB-ASSEMBLY (See INSTALLATION )
- INSTALL FUEL PIPE CLAMP (See INSTALLATION )
- CONNECT VACUUM HOSE (See INSTALLATION )
- CONNECT NO. 1 FUEL VAPOR FEED HOSE (See INSTALLATION )
- INSTALL HARNESS BRACKET (See INSTALLATION )
- INSTALL ENGINE WIRE HARNESS (See INSTALLATION )
- INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE (See INSTALLATION )
- CONNECT CABLE TO NEGATIVE BATTERY TERMINAL
Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)
- ADD ENGINE COOLANT (See REPLACEMENT )
- INSPECT FOR COOLANT LEAK (See ON-VEHICLE INSPECTION )
- INSPECT FOR FUEL LEAK
(See PRECAUTION )
- INSTALL NO. 2 CYLINDER HEAD COVER (See INSTALLATION )
- INSTALL ENGINE UNDER COVER RH
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)
- INSTALL ENGINE UNDER COVER LH
Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)