FixVault

PCV Valve: Installation

  1. INSTALL VENTILATION VALVE SUB-ASSEMBLY 
    1. Apply adhesive to 2 or 3 threads of the ventilation valve.

      Adhesive: 

      Toyota Genuine Adhesive 1324, Three Bond 1324 or equivalent 

      Fig 1: Applying Adhesive To 2 Or 3 Threads Of Ventilation Valve
      G04974406Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Install the ventilation valve.

      Torque: 20 N*m (204 kgf*cm, 15 ft.*lbf) 

      Fig 2: Locating Ventilation Valve Sub-Assembly
      G05399561Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    3. Connect the ventilation hose.
  2. INSTALL INTAKE MANIFOLD  (See INSTALLATION )
  3. INSTALL ENGINE OIL LEVEL DIPSTICK 
  4. INSTALL TRANSMISSION OIL LEVEL GAUGE SUB-ASSEMBLY (for Automatic Transaxle)  (See INSTALLATION )
  5. INSTALL OIL COOLER TUBE (for Automatic Transaxle)  (See INSTALLATION )
  6. INSTALL STARTER ASSEMBLY  (See INSTALLATION )
  7. INSTALL INJECTOR VIBRATION INSULATOR  (See INSTALLATION )
  8. INSTALL NO. 1 DELIVERY PIPE SPACER  (See INSTALLATION )
  9. INSTALL FUEL DELIVERY PIPE SUB-ASSEMBLY  (See INSTALLATION )
  10. CONNECT FUEL TUBE SUB-ASSEMBLY  (See INSTALLATION )
  11. INSTALL FUEL PIPE CLAMP  (See INSTALLATION )
  12. CONNECT VACUUM HOSE  (See INSTALLATION )
  13. CONNECT NO. 1 FUEL VAPOR FEED HOSE  (See INSTALLATION )
  14. INSTALL HARNESS BRACKET  (See INSTALLATION )
  15. INSTALL ENGINE WIRE HARNESS  (See INSTALLATION )
  16. INSTALL AIR CLEANER CAP SUB-ASSEMBLY WITH HOSE  (See INSTALLATION )
  17. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf) 

  18. ADD ENGINE COOLANT  (See REPLACEMENT )
  19. INSPECT FOR COOLANT LEAK  (See ON-VEHICLE INSPECTION )
  20. INSPECT FOR FUEL LEAK 

    (See PRECAUTION )

  21. INSTALL NO. 2 CYLINDER HEAD COVER  (See INSTALLATION )
  22. INSTALL ENGINE UNDER COVER RH 

    Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf) 

  23. INSTALL ENGINE UNDER COVER LH 

    Torque: 5.0 N*m (51 kgf*cm, 44 in.*lbf)