FixVault

Shift Lever Assembly: Installation

  1. INSTALL FLOOR SHIFT SHIFT LEVER ASSEMBLY 
    1. Install the shift lever with the 4 bolts.

    Torque: 12 N*m (122 kgf*cm, 9 ft.*lbf) 

    Fig 1: Identifying Shift Lever With Bolts
    G05539943Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  2. CONNECT TRANSMISSION CONTROL CABLE ASSEMBLY 
    1. Connect the ends of the control cable and install the 2 clips to the shift lever.
      Fig 2: Identifying Ends Of Control Cable
      G05539944Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    2. Turn the lock nuts of the shift cable 270° counterclockwise, and hold them in that position.
    3. Install the shift cable and select cable while holding the lock nuts.
    4. Check that the cables are installed securely.
      Fig 3: Identifying Lock Nuts Of Shift Cable
      G05539945Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    5. Push in the cable locks of the shift cable and select cable.
      Fig 4: Identifying Cable Locks Of Shift Cable And Select Cable
      G05539946Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
  3. INSTALL REAR CONSOLE BOX ASSEMBLY  (See INSTALLATION )
  4. INSTALL REAR CONSOLE PANEL SUB-ASSEMBLY UPPER  (See INSTALLATION )
  5. INSTALL CONSOLE PANEL UPPER  (See INSTALLATION )
  6. INSTALL SHIFT LEVER KNOB SUB-ASSEMBLY  (See INSTALLATION )