FixVault

Combination Meter: Installation: Installation

  1. INSTALL COMBINATION METER ASSEMBLY 
    Fig 1: Identifying Combination Meter Assembly Connectors, Screws & Clips
    GTY157206Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Engage the 2 clips and install the combination meter.
    2. Install the 2 screws and connect the 2 connectors.
  2. INSTALL INSTRUMENT CLUSTER FINISH PANEL 
    Fig 2: Identifying Cluster Finish Panel Claws & Clips
    GTY166089Courtesy of © TOYOTA, LICENSE AGREEMENT TMS1002
    1. Engage the 8 claws and the 5 clips and install the cluster finish panel.
  3. CONNECT CABLE TO NEGATIVE BATTERY TERMINAL 

    Torque: 5.4 N*m (55 kgf*cm, 48 in.*lbf)