Evacuating And Charging: Notes
The following points should be kept in mind when evacuating and charging with a manifold gauge set:
- Be certain that goggles and gloves are worn.
- If bulk refrigerant [13.6 kg (30 lb) canister] is used, be certain to weight the charge amount carefully, using the correct equipment, to avoid overcharging the system.
- The charging procedure described in this section begins by charging liquid refrigerant into the high-pressure side of the system with the engine off. The procedure is completed by charging refrigerant vapor into the low-pressure side of the system with the engine running.CAUTION: Never open the high-pressure manifold valve when the engine is running.