FixVault

Pitching Stopper

  1. Install the pitching stopper.

    Tightening torque: 

    1. T1:  50 N-m (5.1 kgf-m, 37 ft-Ib)
    2. T2:  58 N-m (5.9 kgf-m, 43 ft-Ib)
      Fig 1: Installing The Pitching Stopper
      G02037015
  2. Install the air intake duct and cleaner case.