FixVault

Drive Cycle Preparation: Notes

After performing diagnosis and clearing ECM memory, check for any remaining unresolved DTCs. Separate Green test connector located under left side of instrument panel. See Figure and Figure . Ensure fuel tank is maintained at about 1/2 full and battery voltage is above 12 volts during test.