FixVault

Pitching Stopper

WARNING: This page is about a different variant/trim than selected.
  1. Install the pitching stopper.

    Tightening torque: 

    1. T1:  50 N.m (5.1 kgf-m, 37 ft-lb)
    2. T2:  58 N.m (5.9 kgf-m, 43 ft-lb)
    Fig 1: Installing Pitching Stopper
    G02862880Courtesy of SUBARU OF AMERICA, INC.
  2. Install air cleaner case. Refer to INSTALLATION under AIR CLEANER CASE .
  3. Connect battery ground cable.