FixVault

Oil Charger Pipe: Installation

  1. Install the oil charger pipe with new O-ring.
    1. Tightening torque:  41 N.m (4.2 kgf-m, 30.4 ft-lb)
    Fig 1: Installing Oil Charger Pipe
    G02093153Courtesy of SUBARU OF AMERICA, INC.
  2. Install the air cleaner case. Refer to INSTALLATION , Air Cleaner Case.