FixVault

Oil Charger Pipe: Installation

  1. Install the oil charger pipe with new O-ring.
    1. Tightening torque: 41 N.m (4.2 kgf.m, 30.4 ft.lb) 
    Fig 1: Installing Oil Charger Pipe With O-Ring
    G00917625Courtesy of SUBARU OF AMERICA, INC.
  2. Install starter motor.

    2.5 L model

    Refer to INSTALLATION , Starter.

    3.0 L model

    Refer to INSTALLATION , Starter.

  3. Install the air cleaner case or air intake chamber. (Non-TURBO model)

    Except 2.5 L U5 model

    Refer to INSTALLATION , Air Clean Case.

    2.5 L U5 model

    Refer to INSTALLATION , Air Intake Chamber.

    3.0 L model

    Refer to INSTALLATION , Air Intake Chamber.

  4. Install intercooler. (TURBO model)

    Refer to INSTALLATION , Intercooler.