Starting/Charging (H4SO): Generator: Assembly
Assemble in the reverse order of disassembly.
- Pull-out of the brush
Before assembling, push the brush into the brush holder. Then pass a wire through the hole (dia. 1 mm (0.0394 in), Length: 4 to 5 cm (1.6 to 2.0 in) and fasten at that position.
CAUTION: After re-assembling, remove the wire. - Install the ball bearings.
- Set the ball bearings in the front cover, then firmly install the appropriate tool (such as the right size of socket wrench) to the bearing outer race.
- Using a press to press the ball bearings into the specified positions.
- Install the bearing retainer.
- Using a press to install the bearings (rear side) to the rotor shaft.
- Heat the bearing box inside the rear cover to [50 to 60° C (122 to 140° F] and push the rear bearings into the rear cover.CAUTION: Do not apply grease to the rear bearings. If oil adheres to the bearing box, completely wipe it away.
- After re-assembling, manually turn the pulley to check that the rotor rotates smoothly.