Starting/Charging (H4SO): Generator: Inspection: Stator
- Continuity test
Inspect the continuity between the stator coil lead wire terminals. If the resistance is 1 MΩ or more, replace the stator assembly because the lead wire is damaged.
- Insulation test
Inspect the continuity between the stator coil stator core and lead wire terminals. If the resistance is 1Ω or less, replace the stator assembly because the stator coil is grounded.