Control Valve Body: Installation
- Check the control valve body for dirt and dust.
- Temporarily install the control valve body to transmission.
- Install the oil cooler pipe.
Tightening torque: 8 N.m (0.8 kgf-m, 5.8 ft-lb)
- Tighten the bolts evenly.
Tightening torque: 8 N.m (0.8 kgf-m, 5.8 ft-lb)
- Connect the control valve connector.
- Attach the magnet at specified position of oil pan.
- Apply proper amount of liquid gasket to the entire oil pan mating surface.
Liquid gasket: THREE BOND 1217B (Part No. K0877YA020)
- Apply liquid gasket fully to three holes other than screw holes on transmission case.
Liquid gasket: THREE BOND 1217B (Part No. K0877YA020)
- Install the oil pan with tightening bolts evenly.
Tightening torque: 5 N.m (0.5 kgf-m, 3.6 ft-lb)
- Pour ATF into the oil charge pipe.
Recommended fluid: < Ref. to HYDRAULIC CONTROL AND LUBRICATION , SPECIFICATION, General Description. >
Fluid capacity: Fill the same amount of fluid drained from drain plug hole.
- Bleed the air from control valve. < Ref. to AIR BLEEDING OF CONTROL VALVE . >
- Check the level of ATF. < Ref. to AUTOMATIC TRANSMISSION FLUID . >
- Perform the advance operation of learning control.
< Ref. to FACILITATION OF LEARNING CONTROL , OPERATION, Subaru Select Monitor. >