FixVault
Home
›
Subaru
›
2009
›
Forester XT
›
Repair and Diagnosis
›
Engine Performance
›
Engine Control Systems
›
Fuel Injection System (H4DOTC)
›
Tumble Generator Valve Assembly
›
Installation
Tumble Generator Valve Assembly: Installation
Install in the reverse order of removal.
NOTE:
Use a new gasket.
Tightening torque:
8.3 N.m (0.8 kgf-m, 6.1 ft-lb)
Fig 1: Locating Intake Manifold Bolts
Courtesy of SUBARU OF AMERICA, INC.