FixVault

Wastegate Control Solenoid Valve: Inspection

  1. Measure the resistance between the wastegate control solenoid valve terminals.
    Fig 1: Measuring Resistance Between Wastegate Control Solenoid Valve Terminals
    G06344717Courtesy of SUBARU OF AMERICA, INC.
    RESISTANCE REFERENCE CHART

    Terminal No. Standard
    1 and 2 28 ± 2 Ω (20°C (68°F))
  2. Check that air does not come out of (B) when blowing in (A).
    Fig 2: Checking Air Flow
    G06344718Courtesy of SUBARU OF AMERICA, INC.
  3. Connect the battery positive terminal to the terminal No. 1 and the battery negative terminal to the terminal No. 2. Check that air is discharged from (B), when supplying air to (A).
    Fig 3: Connecting Terminal No. 1 To Battery Positive Terminal And Terminal No. 2 To Battery Negative Terminal
    G06344719Courtesy of SUBARU OF AMERICA, INC.