FixVault

Oil Charge Pipe: Installation

  1. Install the oil charge pipe with a new O-ring.
    NOTE: Use new bolts.

    Tightening torque: 

    38 N.m (3.9 kgf-m, 28.0 ft-lb) 

    Fig 1: Identifying Oil Charge Pipe And O-Ring
    G06342940Courtesy of SUBARU OF AMERICA, INC.
  2. Install the air intake chamber and intake boot. Ref. to INSTALLATION , Air Intake Chamber.