FixVault

Oil Charge Pipe: Installation

  1. Install the oil charge pipe.
    NOTE: Use new gaskets and O-rings.

    Tightening torque: 

    38 N.m (3.9 kgf-m, 28.0 It-lb) 

    Fig 1: Identifying Oil Charge Pipe
    G06652037Courtesy of SUBARU OF AMERICA, INC.
  2. Connect the connector to the turbine speed sensor 1.
  3. Install the front exhaust pipe. Ref. to INSTALLATION , Front Exhaust Pipe.
  4. Install the under cover. Ref. to INSTALLATION , Front Under Cover.
  5. Lower the vehicle.
  6. Connect the ground cable to battery.