FixVault

Engine Mounting: Assembly

  1. Install the front cushion rubber to the front mounting bracket.

    Tightening torque: 

    45 N.m (4.6 kgf-m, 33.2 ft-lb) 

    Fig 1: Locating Front Mounting Bracket
    G06650691Courtesy of SUBARU OF AMERICA, INC.
  2. Install the front cushion rubber to the engine mounting bracket.

    Tightening torque: 

    25 N.m (2.5 kgf-m, 18.4 ft-lb) 

    Fig 2: Locating Engine Mounting Bracket
    G06650690Courtesy of SUBARU OF AMERICA, INC.