Automatic Transmission ASSY: Installation
- Installation of torque converter ASSY
- Engage the input shaft spline with the turbine liner spline.
- Engage the stator shaft spline with the stator spline while turning the torque converter ASSY about 180° clockwise.NOTE: If it is difficult to engage the stator shaft spline with the stator spline, reverse the converter about 10 mm and then turn the torque converter ASSY again to engage the splines.
- Turn the torque converter ASSY clockwise to engage the key of the oil pump drive gear with the key groove of the torque converter ASSY.CAUTION: Do not press the torque converter ASSY excessively to engage it.
- Measure dimension A between the automatic transmission ASSY installing surface of the engine block and the torque converter installing surface of the drive plate.
- Measure dimension B from the end face of the housing after the torque converter ASSY is installed to the converter set block, and check that it is larger than dimension A.
Standard value: B = A + 1 mm {0.04 in} or more
- Installation of oil cooler pipe
- Install the oil cooler pipe with 2 bolts.
Standard value: T=21N.m {214kgf.cm} {15.5ft.lbf}
- Install 2 new oil cooler hoses with 4 hose clamps.
- Install the oil cooler pipe with 2 bolts.
- Installation of wiring harness
- Engage the 6 clamps and install the wiring harness to the automatic transmission ASSY.
- Connect the neutral start switch ASSY connector, transmission wire connector, and transmission revolution sensor (SP2) connector.NOTE: For the transmission wire connector, push up the lever until a sound indicating the claw is hooked is heard.
- Installation of automatic transmission ASSY
- Make sure that the knock pins are attached to 2 locations on the engine side.
- Keep the engine and the automatic transmission ASSY horizontal, then align the knock pins and the knock pin holes and tighten the 2 bolts and 2 nuts shown in the figure.
Standard value: T=50N.m {510kgf.cm} {36.9ft.lbf}
CAUTION: Do not pry apart the automatic transmission ASSY with excessive force.
- Installation of engine mounting insulator RR No. 1
- Install the engine mounting insulator RR No. 1 to the automatic transmission ASSY with 4 bolts.
Standard value: T=40N.m {408kgf.cm} {29.5ft.lbf}
- Install the engine mounting insulator RR No. 1 to the automatic transmission ASSY with 4 bolts.
- Installation of engine rear mounting member
- Install the engine rear mounting member with 4 bolts, 2 nuts, and 2 washers.
Standard value: T=55N.m {561kgf.cm} {40.6ft.lbf} (nut)
T=65N.m {663kgf.cm} {17.0ft.lbf} (bolt)
- Install the engine rear mounting member with 4 bolts, 2 nuts, and 2 washers.
- Installation of exhaust pipe bracket
- Install the exhaust pipe bracket with 2 bolts.
Standard value: T=23N.m {235kgf.cm} {17.0ft.lbf}
- Install the exhaust pipe bracket with 2 bolts.
- Connection of floor shift gear shifting rod SUB-ASSY No. 1
- Install the grommet and spacer to the control shaft lever RH.
- Connect the floor shift gear shifting rod SUB-ASSY No. 1 to the control shaft lever RH and install the snap pin and the shaft.
- Set the select lever to N position.
- Insert a 0.3 mm thickness gauge between the select lever and the guide plate, and secure it with tape, etc.CAUTION: Keep the thickness gauge from entering the portion (arc) shown in the figure.
- Pull the floor shift gear shifting rod SUB-ASSY No. 1 toward the rear of the vehicle until it stops, then put it back 2 steps (to N position).
- Temporarily install the floor shift gear shifting rod SUB-ASSY No. 1 with a nut while seating it on the flat surface of the swivel.CAUTION: Be sure to seat it by hand and temporarily tighten the nut.
- Tighten the nut with the arm COMPL lightly pressed toward the rear of the vehicle.
Standard value: T=18N.m {184kgf.cm} {13.3ft.lbf}
CAUTION:- Do not press the arm COMPL excessively.
- Check that the floor shift gear shifting rod SUB-ASSY No. 1 remains seated on the flat surface of the swivel.
- Installation of transmission revolution sensor (NT) (refer to INSTALLATION )
- Connection of oil cooler tube
- Tighten the oil cooler pipe together with the oil cooler tube with 2 bolts.
Standard value: T=21N.m {214kgf.cm} {15.5ft.lbf}
- Tighten the oil cooler pipe together with the oil cooler tube with 2 bolts.
- Installation of transmission oil cooler hose
- Install 2 new transmission oil cooler hoses with 4 hose clamps.
- Installation of exhaust pipe ASSY.
(Refer to REMOVAL )
- Connection of automatic transmission ASSY
- Tighten the 2 connecting bolts on the automatic transmission ASSY.
Standard value: T=50N.m {510kgf.cm} {36.9ft.lbf}
- Tighten the 2 connecting bolts on the automatic transmission ASSY.
- Remove the SST.
- Installation of drive plate and torque converter setting bolt
- Install the drive plate and 6 torque converter setting bolts.
Standard value: T=25N.m {255kgf.cm} {18.4ft.lbf}
CAUTION:- Be careful not to drop the drive plate and the torque converter setting bolts into the clutch housing.
- Be careful not to damage the drive plate and the torque converter setting bolts.
- Install the drive plate and 6 torque converter setting bolts.
- Installation of flywheel housing under cover
- Install the flywheel housing under cover.
- Installation of vacuum pipe
- Install the vacuum pipe with 2 bolts.
Standard value: T=18N.m {184kgf.cm} {13.3ft.lbf}
- Install the vacuum pipe with 2 bolts.
- Connection of wiring harness
- Install the engine hanger No. 2 with 2 bolts.
Standard value: T=21N.m {214kgf.cm} {15.5ft.lbf}
- Install the wiring harness clamp bracket with the bolt.
Standard value: T=7.5N.m {77kgf.cm} {13.3ft.lbf}
- Engage the clamp to connect the wiring harness.
- Connect the 3 connectors.NOTE: For connector A, push down the lever until a sound indicating the claw is hooked is heard.
- Engage the 4 clamps to connect the wiring harness to the intake manifold.
- Connect the ground wire with the bolt.
Standard value: T=13N.m {133kgf.cm} {9.6ft.lbf}
- Connect the 2 connectors.NOTE: For connector A, push down the lever until a sound indicating the claw is hooked is heard.
- Install the engine hanger No. 2 with 2 bolts.
- Installation of starter ASSY
(Refer to INSTALLATION )
- Installation of air cleaner ASSY W/hose
(Refer to INSTALLATION )
- Installation of stabilizer bar FR
(Refer to INSPECTION )
- Installation of propeller shaft W/center bearing ASSY
(Refer to INSTALLATION )
- Installation of under cover COMPL T/M (refer to COOLING SYSTEM (FA20) )
- Installation of under cover front AL (refer to COOLING SYSTEM (FA20) )
- Connection of battery ground terminal (refer to INSTALLATION )
- Check of select lever position (refer to ON-VEHICLE INSPECTION )
- Filling of automatic transmission fluid (Refer to ADJUSTMENT )
- Check of exhaust gas leakage (refer to COOLING SYSTEM (FA20) )
- Initialization when removing/installing battery terminals
(Refer to WORKING PRECAUTIONS AND NOTES )