FixVault

Unit Inspection

  1. Transmission revolution sensor (SP2) check
    1. Measure the resistance between the terminals.
      RESISTANCE

      Inspection terminals Inspection conditions Standard value
      Terminal 1 - terminal 2 20°C (68°F) 560 to 680 Ω
      Fig 1: Identifying Transmission Revolution Sensor Terminals (SP2)
      G08554363Courtesy of SUBARU OF AMERICA, INC.
  2. Check of transmission revolution sensor (NT)
    1. Measure the resistance between the terminals.
      RESISTANCE

      Inspection terminals Inspection conditions Standard value
      Terminal 1 - terminal 2 20°C (68°F) 560 to 680 Ω
      Fig 2: Identifying Transmission Revolution Sensor Terminals (NT)
      G08554364Courtesy of SUBARU OF AMERICA, INC.