Front Lateral Link: Installation
CAUTION:
- For parts which are not reusable, always use new parts.
- Always tighten the bushing in the state where the vehicle is at curb weight and the wheels are in full contact with the ground.
- Before installation, inspect the following items and replace any faulty part with a new one.
- Visually check the lateral link assembly - front for damage and deformation.
- Visually check the bushing for abnormal cracks, fatigue or damage.
- Visually check the dust cover on the ball joint for abnormal cracks, fatigue or damage.
- Install the lateral link assembly - front.CAUTION:
- When installing the adjusting bolt (d), make sure to fix the bolt head in place and tighten the nut side (e).
- Align alignment marks (c) on the adjusting bolt for lateral link assembly - front and on the rear sub frame assembly.
Tightening torque:
Refer to "COMPONENT" of "General Description" for the tightening torque. <Ref. to COMPONENT , General Description.>
- Install the nuts, and install the cable assembly - parking brake.
Tightening torque:
18 N.m (1.8 kgf-m, 13.3 ft-lb)
- Install the trailing link.
Tightening torque:
110 N.m (11.2 kgf-m, 81.1 ft-lb)
- Install the rear wheels and lower the vehicle.
Tightening torque:
120 N.m (12.2 kgf-m, 88.5 ft-lb)
- Inspect the wheel alignment and adjust if necessary.
- Inspection: <Ref. to INSPECTION , Wheel Alignment.>
- Adjustment: <Ref. to ADJUSTMENT , Wheel Alignment.>
CAUTION: When the wheel alignment has been adjusted, perform "VDC sensor midpoint setting mode" of the VDC. <Ref. to ADJUSTMENT , VDC Control Module and Hydraulic Control Unit (VDCCM & H/U).>