FixVault

Combination Meter Assembly: Installation

  1. Installation of the combination meter assembly
    1. Connect the connector.
    2. Engage two clips and install the combination meter assembly.
    3. Install the 2 screws.
  2. Installation of the instrument panel meter ornament UPR (Refer to INSTALLATION )
  3. Installation of the meter hood sub-assembly (Refer to INSTALLATION )
  4. Installation of instrument cluster finish panel sub-assembly CTR (Refer to INSTALLATION )
  5. Connection of the battery ground terminal

    Standard value: T=6.0N.m {61kgf.cm} {4.4ft.lbf}

  6. Settings when removing/installing battery terminals (Refer to SETTING PROCEDURES AT PARTS REPLACEMENT AND REMOVAL/INSTALLATION )