Toe Control Link: Inspection
- Inspection of toe control link sub-assembly LH
- Inspection of ball joint
- Install the mounting nut on the stud of the toe control link sub-assembly LH.
- Vibrate and turn the stud.
Criteria: There is no abnormal interference or play during vibration and turning.
- If there is abnormal interference or play during vibration and turning, replace the toe control link sub-assembly LH.
- Dust cover inspection
- Check the dust cover for cracks or grease leakage.
- If there are cracks or grease leakage on the dust cover, replace the toe control link sub-assembly LH.
- Inspection of ball joint