FixVault

Toe Control Link: Installation

NOTE:
  • The following procedure is for LH side.
  • Service the LH side and the RH side using the same procedure.
  1. Temporary tightening of toe control link sub-assembly LH
    1. After inserting the toe adjust cam from the front of the vehicle, install the toe control link sub-assembly LH and temporarily tighten it with the toe adjust plate No. 2 using a new nut.
      CAUTION: Align the alignment marks of the rear suspension member sub-assembly and the toe adjust plate No. 2.
    2. Install the toe control link to the axle carrier, and tighten it with the nut.

      Standard value: T=60N.m {612kgf.cm} {44.3ft.lbf}

    3. Install a new snap pin.
  2. Temporary tightening of rear suspension arm assembly No. 1 LH (Refer to INSTALLATION  )
  3. Stabilization of vehicle (Refer to DISPOSAL  )
  4. Final tightening of toe control link sub-assembly LH
    1. Fully tighten the nut on the side of the rear suspension member sub-assembly.

      Standard value: T=100N.m {1020kgf.cm} {73.8ft.lbf}

      CAUTION: Make sure that the alignment marks of the rear suspension member sub-assembly and the toe adjust plate No. 2 are aligned.
  5. Final tightening of rear suspension arm assembly No. 1 LH (Refer to TOE CONTROL LINK  )
  6. Installation of rear tire

    Standard value: T=120N.m {1224kgf.cm} {88.5ft.lbf}

  7. Inspection and adjustment of rear wheel alignment (Refer to REAR WHEEL ALIGNMENT )
  8. Headlight beam adjustment (Refer to ADJUSTMENT )
  9. Mid point setting of the VDC sensor (Refer to WORK SUPPORT )