Instrument panel LWR: Installation
- Installation of instrument panel SUB-ASSY LWR
- Engage the 14 claws and connect the connectors and clamps.
- Connect the aspirator hose. (for automatic air conditioning system)
- Install the 2 screws and nuts.
- With the 7 screws, install the instrument panel SUB-ASSY LWR.
- Installation of glove compartment door damper
- Engage the claw and install the glove compartment door damper.
- Installation of glove compartment door ASSY
- Engage the 2 hinges of the glove compartment door ASSY horizontally.
- Engage the 2 stoppers and install the glove compartment door ASSY.CAUTION: If the stoppers are engaged from above, the hinges may be loosened. Always engage them horizontally.
- Engage the claw and install the glove compartment door damper.
- Installation of the instrument panel under cover SUB-ASSY No. 1 (Refer to Installation )
- Installation of instrument panel meter ornament UPR
- Connect the connector.
- Engage the 2 claws connecting the instrument panel meter ornament UPR to the steering column cover.
- Engage the 2 clips and 6 claws and install the instrument panel meter ornament UPR.
- Installation of meter hood SUB-ASSY
- Fit in the 12 claws.
- With the screw, install the meter hood SUB-ASSY.
- Installation of instrument side panel RH
- Engage the 4 clips and the claw and install the instrument panel side panel RH.
- Installation of instrument side panel LHNOTE: Install the part in the same manner as RH side.
- Installation of air conditioner control ASSY (for automatic air conditioning system) (Refer to Disassembly )
- Installation of air conditioner control ASSY (for manual air conditioning system) (Refer to Installation )
- Installation of instrument panel finish panel SUB-ASSY UPR (installed on the RH side)
- Fit in the 3 claws.
- With the screw, install the instrument panel finish panel SUB-ASSY UPR.
- Installation of instrument cluster finish panel garnish NO. 1
- Fit in the 6 claws.CAUTION: If the claws are not correctly inserted, the claws may be damaged.
- With the screw, install the instrument cluster finish panel garnish NO. 1.
- Fit in the 6 claws.
- Installation of instrument panel finish panel SUB-ASSY UPR (installed on the LH side)NOTE: Install the part in the same manner as RH side.
- Installation of instrument cluster finish panel garnish NO. 2NOTE: Install the part in the same manner as RH side.
- Installation of the navigation system (with bracket)
- Install the navigation system (with bracket) in place using the four bolts.
- Installation of instrument cluster finish panel SUB-ASSY (large type)
- Engage the 8 clips and 2 claws and install the instrument cluster finish panel SUB-ASSY (large type).
- Installation of instrument cluster finish panel SUB-ASSY CTR
- Engage the 2 clips and 2 claws and install the instrument cluster finish panel SUB-ASSY CTR.
- Installation of instrument panel ornament
- Engage the 6 clips and install the instrument panel ornament.
- Installation of console box ASSY (Refer to Disassembly )
- Connection of the battery ground terminal
Standard value: T=6.0N.m {61kgf.cm} {4.4ft.lbf}
- Settings when removing/installing battery terminals (Refer to Setting procedures at parts replacement and removal/installation )
- Inspection of airbag warning light (Refer to Wiring diagram )