FixVault

Combination meter ASSY: Installation

NOTE: The procedures described below are for the normal meter. Operate the TFT meter performing the same procedures as the normal meter.
  1. Installation of the combination meter ASSY
    1. Connect the connector.
    2. Engage two clips and install the combination meter ASSY.
    3. Install the 2 screws.
  2. Installation of the instrument panel meter ornament UPR (Refer to Installation )
  3. Installation of the meter hood SUB-ASSY (Refer to Installation )
  4. Installation of instrument cluster finish panel SUB-ASSY (large type) (Refer to Installation )
  5. Installation of instrument cluster finish panel SUB-ASSY CTR (Refer to Installation )
  6. Installation of the instrument panel ornament (Refer to Installation )
  7. Connection of the battery ground terminal

    Standard value: T=6.0N.m {61kgf.cm} {4.4ft.lbf}

  8. Settings when removing/installing battery terminals (Refer to Setting procedures at parts replacement and removal/installation )