FixVault

External Connection Terminal: Installation

  1. Install the unit assembly - AUX.
  2. Install the pocket assembly - CTR.
  3. Install the panel center LWR.
  4. Install the cover assembly - front and the console box assembly.

    Tightening torque: 

    6.5 N.m (0.6 kgf-m, 4.8 ft-lb) 

  5. Install the heater control assembly.
  6. Connect the ground terminal to battery sensor. Ref. to BATTERY