FixVault

Power Amplifier: Installation

  1. Install the power amplifier assembly.

    Tightening torque: 

    7.5 N.m (0.8 kgf-m, 5.5 ft-lb) 

  2. Connect the ground terminal to battery sensor. Ref. to BATTERY