FixVault

Unit Inspection

  1. Transmission revolution sensor (SP2) check
    1. Measure the resistance between the terminals.

    Resistance

    Inspection terminals Inspection conditions Standard value
    Terminal 1 - terminal 2 20°C (68°F) 560 to 680Ω
    G12587434Courtesy of SUBARU OF AMERICA, INC.
  2. Check of transmission revolution sensor (NT)
    1. Measure the resistance between the terminals.

    Resistance

    Inspection terminals Inspection conditions Standard value
    Terminal 1 - terminal 2 20°C (68°F) 560 to 680Ω
    G12587435Courtesy of SUBARU OF AMERICA, INC.