FixVault

Preparation For Overhaul: Procedure

  1. Clean the transmission exterior.
  2. Remove the torque converter assembly. Ref. to CONTINUOUSLY VARIABLE TRANSMISSION(TR690)>Torque Converter Assembly>REMOVAL .
  3. Attach the ST on the transmission.

    ST 18632AA000 STAND ASSY 

    G06654494Courtesy of SUBARU OF AMERICA, INC.
  4. Remove the transmission cover on the transmission upper side.
    NOTE: Install using the following tightening torque.

    Tightening torque:

    8 N.m (0.8 kgf-m, 5.9 ft-lb)

    G10276067Courtesy of SUBARU OF AMERICA, INC.
  5. Place the transmission assembly on end.