FixVault

Primary Speed Sensor: Installation

CAUTION: Be sure to prevent water or oil from contacting the connector terminal of primary speed sensor. If adhesion occurs, replace with a new part.
  1. Install the primary speed sensor.
    NOTE:
    • Use new O-rings.
    • Apply CVTF to the O-rings.

    Tightening torque:

    5 N.m (0.5 kgf-m, 3.7 ft-lb)

  2. Connect the harness connector.
  3. Install the harness stay.

    Tightening torque:

    16 N.m (1.6 kgf-m, 11.8 ft-lb)

  4. Install the air intake boot. Ref. to INTAKE (INDUCTION) (H6DO)>Air Intake Boot>INSTALLATION .
  5. Connect the ground terminal to battery sensor. Ref. to REPAIR CONTENTS>NOTE>BATTERY .
  6. Install the collector cover.