Front Exhaust Pipe: Installation
WARNING: This page is about a different variant/trim than selected.
- Install the front exhaust pipe.NOTE: Use a new gasket.
Tightening Torque:
40 N.m (4.1 kgf-m, 29.5 ft-lb)
- Install the joint pipe to the exhaust manifold RH.NOTE: Use a new gasket.
Tightening Torque:
42.5 N.m (4.3 kgf-m, 31.3 ft-lb)
- Install the exhaust manifold RH lower cover and exhaust manifold LH cover.
Tightening Torque:
19 N.m (1.9 kgf-m, 14.0 ft-lb)
- Install the Front Oxygen (A/F) Sensor. Ref. to FUEL INJECTION (FUEL SYSTEMS) (STI)>Front Oxygen (A/F) Sensor>INSTALLATION .
- Install the under cover. Ref. to EXTERIOR/INTERIOR TRIM>Front Under Cover>INSTALLATION .
- Lower the vehicle.
- Connect the battery ground terminal.