FixVault

Gateway Control Module: Installation

  1. Install the central gateway Control Module.
  2. Install the reinforcement - combination meter.
  3. Install the combination meter assembly.
  4. Install the grille assembly - CTR ventilation LH.
  5. Connect the battery ground terminal. Refer to REPAIR CONTENTS>REPAIR CONTENTS>NOTE>BATTERY .