FixVault

External Connection Terminal: Installation: Front

  1. Install the AUX unit assembly.
  2. Install the tray center UPR. Ref. to EXTERIOR/INTERIOR TRIM>CENTER CONSOLE>INSTALLATION .
  3. Install the heater control assembly. Ref. to AIR CONDITIONER>CONTROL PANEL>INSTALLATION .
  4. Connect the battery ground terminal. Ref. to REPAIR CONTENTS>NOTE>BATTERY .